70-412 Configuring Advanced Windows Server 2012 Services


QUESTION 1
You are employed as a network administrator at ABC.com. ABC.com has an Active Directory
domain named ABC.com. All servers on the ABC.com network have Windows Server 2012 installed.
ABC.com has a server, named ABC-SR07, which is configured as a DHCP server. You have
created a superscope on ABC-SR07.
Which of the following describes a reason for creating a superscope? (Choose all that apply.)

A. To support DHCP clients on a single physical network segment where multiple logical IP
networks are used.
B. To allow for the sending of network traffic to a group of endpointsdestination hosts.
C. To support remote DHCP clients located on the far side of DHCP and BOOTP relay agents.
D. To provide fault tolerance.

Answer: A,C

Explanation:


QUESTION 2
You are employed as a network administrator at ABC.com. ABC.com has an Active Directory
domain named ABC.com. All servers, including domain controllers, on the ABC.com network have
Windows Server 2012 installed.
ABC.com has a domain controller, named ABC-DC01, which is configured as a DNS server. You
are planning to unsign the ABC.com zone.
Why should you unsign the zone?

A. To remove the zone.
B. To change the current zone type.
C. To add a new primary zone.
D. To create an Active Directory-integrated zone.

Answer: B

Explanation:


QUESTION 3
You are employed as a network administrator at ABC.com. ABC.com has an Active Directory
domain named ABC.com. All servers on the ABC.com network have Windows Server 2012 installed.
ABC.com has a server named ABC-SR01, which hosts the IP Address Management (IPAM)
Server feature. ABC.com also has a server, named ABC-SR02, which is configured as a DHCP server.
You have been instructed to make sure that a user, named Mia Hamm, who belongs to the IPAM
Users group on ABC-SR01, has the ability to modify the DHCP scopes on ABC-SR02 by making
use of use IPAM. You want to achieve this without assigning Mia Hamm any unnecessary permissions.
Which of the following actions should you take?

A. You should consider making Mia Hamm a member of the DHCP Administrators group on ABCSR02.
B. You should consider making Mia Hamm a member of the IPAM Administrators group on ABCSR02.
C. You should consider making Mia Hamm a member of the Local Administrators group on ABCSR02.
D. You should consider making Mia Hamm a member of the Domain Administrators group.

Answer: A

Explanation:


MCTS Training, MCITP Trainnig

Best Microsoft MCSE Certification, Microsoft 70-412 Training at certkingdom.com

 

640-864 Designing for Cisco Internetwork Solutions Exam (DESGN) v2.1


QUESTION 1
According to Cisco, which four improvements are the main benefits of the PPDIOO lifecycle
approach to network design? (Choose four.)

A. Faster ROI
B. Improved business agility
C. Increased network availability
D. Faster access to applications and services
E. Lower total cost of network ownership
F. Better implementation team engagement

Answer: B,C,D,E

Explanation:
The PPDIOO life cycle provides four main benefits:
+ It improves business agility by establishing business requirements and technology strategies.
+ It increases network availability by producing a sound network design and validating the network
operation.
+ It speeds access to applications and services by improving availability, reliability, security,
scalability, and performance.
+ It lowers the total cost of ownership by validating technology requirements and planning for
infrastructure changes and resource requirements.
(Reference: Cisco CCDA Official Exam Certification Guide, 3rd Edition) described in the link
below.
Link:https:://www.ciscopress.com/articles/article.asp?p=1608131&seqNum=3


QUESTION 2
Characterizing an existing network requires gathering as much information about the network as
possible. Which of these choices describes the preferred order for the information-gathering
process?

A. Site and network audits, traffic analysis, existing documentation and organizational input
B. Existing documentation and organizational input, site and network audits, traffic analysis
C. Traffic analysis, existing documentation and organizational input, site and network audits
D. Site and network audits, existing documentation and organizational input, traffic analysis

Answer: B

Explanation:
This section describes the steps necessary to characterize the existing network infrastructure and
all sites. This process requires three steps:
Step 1. Gather existing documentation about the network, and query the organization to discover
additional information. Organization input, a network audit, and traffic analysis provide the key
information you need. (Note that existing documentation may be inaccurate.)
Step 2. Perform a network audit that adds detail to the description of the network. If
possible, use traffic-analysis information to augment organizational input when you are describing
the applications and protocols used in the network.
Step 3. Based on your network characterization, write a summary report that describes the health
of the network. With this information, you can propose hardware and software upgrades to support
the network requirements and the organizational requirements.


QUESTION 3
You want to gather as much detail as possible during a network audit with a minimal impact on the
network devices themselves.
Which tool would you use to include data time stamping across a large number of interfaces while
being customized according to each interface?

A. RMON
B. SNMPv3
C. NetFlow
D. Cisco Discovery Protocol

Answer: C

Explanation:


QUESTION 4
Which three are considered as technical constraints when identifying network requirements?
(Choose three.)

A. Support for legacy applications
B. Bandwidth support for new applications
C. Limited budget allocation
D. Policy limitations
E. Limited support staff to complete assessment
F. Support for existing legacy equipment
G. Limited timeframe to implement

Answer: A,B,F

Explanation:
Network design might be constrained by parameters that limit the solution. Legacy applications
might still exist that must be supported going forward, and these applications might require a
legacy protocol that may limit a design. Technical constraints include the following:
Existing wiring does not support new technology.
Bandwidth might not support new applications.
The network must support exiting legacy equipment.
Legacy applications must be supported (application compatibility).


QUESTION 5
In which phase of PPDIOO are the network requirements identified?

A. Design
B. Plan
C. Prepare
D. Implement
E. Operate
F. Optimize

Answer: B

Explanation:

Plan Phase
The Plan phase identifies the network requirements based on goals, facilities, and user needs.
This phase characterizes sites and assesses the network, performs a gap analysis against bestpractice
architectures, and looks at the operational environment. A project plan is developed to
manage the tasks, responsible parties, milestones, and resources to do the design and
implementation. The project plan aligns with the scope, cost, and resource parameters established
with the original business requirements. This project plan is followed (and updated) during all
phases of the cycle.


MCTS Training, MCITP Trainnig

Best CCDA Training and 640-864 Certification
and more Cisco exams log in to Certkingdom.com